- D/618/7406 Unit 5: Challenges of IT Security in Modern Organizations – Risks, Solutions & Best Practices
- HSC Level 2/3 Unit 012 Assignment: Care Worker Responsibilities and Ways of Working
- CIPD Level 5HR03 Assignment: Understanding Reward Approaches and Their Impact on Performance and Contribution
- CIPD level 5HR02 Assignment: Talent Management and Workforce Planning Unit Guide
- Level 3 D/615/3823 Assignment: Regulation, Protection, and Collaborative Practice in Health and Social Care
- PGM216D Assignment: Bicycle Store Sales Management Application
- MATH6033 Assignment: Epidemiological Investigation of Cardiovascular Health and Tea Consumption Risks
- EH6147 Assingment: Stakeholder Analysis for Quality Improvement in Hand Hygiene Compliance
- Assignment: Investigation of Solution Concentration Through Standard Preparation, Titration, and Colorimetry Techniques
- MATH6033 Assignment: Cardiovascular Risk and Tea Drinking: Epidemiological Analyses
- CIPD level 3 3CO03 Assignment: Core behaviours for people professionals
- DAC4B1: Personal development in adult care settings
- Unit 19 Research Project Assignment 1: Impact of Corporate Social Responsibility on Business Success & Community Wellness
- EG5022 Assignment: Georeferencing and Accuracy Assessment of a Quarry 3D Model Using Photogrammetric GCPs
- Assignment: Financial Performance and Strategic Analysis of a UK Listed Company: A CORE Evaluation and Reflective Review
- 5CNMN002W Assignment: Advanced measurement- Major measurement taking off
- K/650/2298 Level 3 Understanding Roles, Responsibilities, and Effective Partnerships in Health and Social Care
- Understanding Information and Knowledge Management in the Workplace: A Briefing for HR Professionals
- HRM7010D Strategic Use of People Analytics in Enhancing Organisational Value and Agility
- TOWN1060 Urban Planning in the UK History Sustainable Design and Future City Development
Assuming you are a building construction engineer, your client has asked you to carry out an evaluation: Quantity surveying Assignment, ARU, UK
University | Anglia Ruskin University (ARU) |
Subject | Quantity surveying Assignment |
Assuming you are a building construction engineer, your client has asked you to carry out an evaluation of and report on an existing commercial building. Using an iconic building in the UK as a case study, describe the existing construction features presented below:
- Foundations (including ground floor)
- Structural Frame and Cladding
- Roof and roof covering
- Upper floor (s)
For each of the above elements, critically analyze the construction details in relation to functional requirements and sustainability, with the aid of images/ drawings and photographs. The analysis should cover:
- Materials used
- Design
- Construction methods
For your case study, in particular, you should also produce a series of annotated drawings/sketches that show how each element of your selected building is constructed and relates to the other elements. The drawings/sketches are to be your own and not downloaded from the Internet.
Furthermore, your client has further instructed you to propose innovative solutions for upgrading the building in compliance with the current building regulations, sustainable construction materials, and methods to improve the overall building performance.
Discuss and critically analyze the main differences between high-rise and low-rise commercial building requirements for each of the elements highlighted above. Give examples and evidence of existing commercial buildings to support your analysis.
Do You Need Assignment of This Question
In need of Assignment Help UK or a Report Writing Service? Look no further! Our specialized support targets students at Anglia Ruskin University (ARU) grappling with Quantity Surveying Assignments.
Assume the role of a building construction engineer as you tackle evaluations requested by your client. UK students can enlist our expert guidance by paying for tailored assistance, ensuring success in their coursework at ARU.
