- General Defences to Criminal Liability Assignment UK
- The Principles of Business and Resource Management for Leaders of Adult Social assignment NVQ Level 5 Assignment UK
- Printed Circuit Board (PCB) Inspection Jig BTEC (RQF) Level 4 Assignment, PC, UK
- Property Law: Research, Case Analysis, and Legal Advice Assignment UK
- SCEE08002 Structural Mechanics 2 Laboratories Assignment UK
- Working in Partnership in Health and Social Care Assignment UK
- Aircraft Structural Mechanics 3 Design & Optimisation Project UK
- Responsibilities of a Health and Social Care Worker NVQ Level 3 Assignment, LCPA UK
- TC50324E: Measurement and Documentation Assignment 1, UOWL, UK
- Business Ethics and Responsible Management Semester 1 Assignment, URBS, UK
- Working in Partnership in Health and Social Care Management Assignment UK
- HH5561 Health Economics and Decision Modelling Assignment, UOG, UK
- Civil CEP: Numerical Analysis Assignment 1, UOB, UK
- CIPD Level 3 Foundation Unit 1 Assignment, OU, UK
- HSC301 State the Roles and Responsibilities Assignment, ILC, UK
- ProQual Level 6 NVQ Diploma in Occupational Health and Safety Practice Assignment UK
- Corporate Finance and Business Valuation Assignment
- HNC-D 10 Financial Accounting Assignment
- MN5612 Digital Marketing Strategy Assignment
- Social Roles In The Caring Professions Assignment Brief
Your employment as a graduate quantity surveyor in an international quantity surveying practice has commenced: Analytical Chemistry and Measurement Science Assignment, TUM, UK
University | The University of Manchester (TUM) |
Subject | Analytical Chemistry and Measurement Science |
Assignment Brief and Guidance
Your employment as a graduate quantity surveyor in an international quantity surveying practice has commenced. You have been tasked with a take-off for a two-story Observation Tower. The building will be constructed by a simple R.C. structure, with a 100 mm thick concrete block wall enclosed as
a reception area located on the ground floor. The whole construction project will be in the use of a rule of measurement adopted in H.K. within which the work will be undertaken.
You will be tasked with providing the following considerations for the initial stages of the Observation Tower project.
- An explanation of the technique that you will use to produce quantities.
- Why accuracy is important when using this technique.
- Assemble bills of quantities for a section of work from the measurements.
Assignment 1
1) The production of accurate quantities is essential in avoiding disputes and claims during the construction stage of a project. Produce a short synopsis that outlines the techniques that can be used, both digitally and manually, for the production of accurate quantities for the project. The critique should evaluate in critical terms the relationship between the technique and accuracy.
2) Normally construction projects’ quantities are produced in an agreed format. This format is termed a ‘Rule of Measurement’ and in H. K. this is produced by The Hong Kong Institute of Surveyors. Local rules of measurement being existed that must be honored in the territory where
the project is going to be built. Produce an explanation of how the use of a rule of measurement supports the production of accurate quantities.
3) With reference to the attached Drawings No. M&D-2014-01 and M&D-2014-02, take off the quantities for both substructural and superstructural works of the building. Plastering and paving, painting are applied to the internal of the reception. Produce the following quantities using dimension papers.
Buy Answer of This Assessment & Raise Your Grades
Don’t wait for the last-minute submission of your Analytical Chemistry and Measurement Science Assignment and get the affordable solution from Assignment help UK. our brilliant experts provide the CIPD assignment help, HND assignment help, HNC assignment help, and Nursing assignment help as per your university norms within the timeline.